We are currently in the process of planning for the redevelopment of our building, the Water Eaton Church Centre. We are doing this in partnership with St Frideswide’s, the other congregation with whom we share the building.

The main feature of our redevelopment will be the construction of a new roof, although this also includes significant changes inside our building too.

A Prayer for the Building Project:

Almighty God, we long to see your kingdom come in this community and beyond. Thank you for your provision in so many ways over so many years. Please keep our eyes, ears, hearts and minds open to your Holy Spirit. Guide us safely as we plan together for the future mission and ministry of Water Eaton Church Centre. Please send us the resources we need to do the work that you are calling us to do. Amen.

Updated information and progress on our building project will be added below:

August – Prayers for the WECC Building Project as we enter a new phase of external fundraising for the wider development of the Water Eaton Church Centre

As we give thanks for all that God has already enabled – the installation of the solar panels, the air‑source heat pump, and the redevelopment of the Media Room and Lounge – we now enter a new phase of external fundraising for the wider redevelopment of the Water Eaton Church Centre. We invite the whole church family to uphold this journey in prayer, trusting in the God who does immeasurably more than all we ask or imagine, just as the apostle Paul wrote in Ephesians 3:20-21:

Now to him who is able to do immeasurably more than all we ask or imagine, according to his power that is at work within us, to him be glory in the church and in Christ Jesus throughout all generations, for ever and ever! Amen

Below are areas to help guide your prayers:

  • Thanksgiving for faithful giving — We give thanks for the faithful generosity of our fellowships, which has enabled the renovation of the media room and lounge block.
  • Guidance and discernment — Pray for God’s guidance, and for our discernment and obedience as we follow His leading.
  • Wisdom in planning — Ask for wisdom and clarity as plans are shaped, leaders identified, and teams formed for the work ahead.
  • Christ‑like character — Pray for humility, honesty, unity, perseverance, and patience throughout the whole process.
  • Clear communication — For clarity, grace, and unity in all communication with the congregation, partners, and wider community.
  • Preparation of donors and partners — May God prepare donors, grant funders, and businesses He inspires to contribute, and may they sense His presence in every interaction with us.
  • Fruitful relationships — That relationships formed through this project—whether with funders, neighbours, or contractors—would be marked by kindness, integrity, and witness.
  • Boldness for our fellowships — Pray that our fellowships and community will be filled with courage and boldness as we participate in this journey.
  • Protection over the project — For God’s protection over all contractors, staff, volunteers, and decision‑makers involved.
  • Spiritual renewal — That the rebuilding work would also renew our spiritual life as a church, deepening faith and strengthening discipleship.
  • Joy in the process — That even in the hard work, God would give us joy, hope, and encouragement as we see His hand at work.
  • Provision of resources — Ask God to provide every resource needed to accomplish the work He has called us to do.
  • Unity in the building journey — Pray that we walk this building project as one body in Christ, sustained by prayer and mindful that we labour for God’s work now and for generations to come.

6th July – Re-roofing and Refurbishment of the Media Room & Lounge

The re-roofing and refurbishment of the Media Room and Lounge wing has begun as part of the first phase of the building project!

As a result, the right-hand door of the Church Centre will not be in use. Please use the left-hand door for entry & exit.

See some of the progress which has been made so far below:

8th December 2025 – WECC Building Plans Update

10th September 2025 – Approval of Planning Application

Great news! On 10th September we received news that our planning application for the building project to MK Council has been approved! This is a significant moment in the journey to realising our hopes for a renewed Water Eaton Church Centre, fit for ministry and mission for the next generation. Our deepest thanks to Grindley Architects for their excellent work on this.

We would like to also reiterate our thanks to everyone who has made a contribution to our fundraising appeal, which we launched at our wonderful anniversary celebrations back in June.

Further fantastic news is that the total of this appeal stands at £341,844.

This is a combination of one-off gifts, pledges to be received at some point in the future, or regular monthly gifts (projected over the coming three years). A total of 76 yellow envelopes were returned and the balance of the support was broadly equal across the congregations of St Frideswide’s and Spurgeons. It is humbling and inspiring to have seen such a display of support for the plans, trust in one another and faith in God’s provision.

This means that our WECC building development fund now stands at £503,880 (a combination of money in the bank and projected giving over the next three years).

We now enter a phase of further fundraising and discernment. Grindley Architects are now renewing the cost plan of the project. They and our fundraising consultant (Andrew Clark of Church Grants) will be supporting us in planning for what we can realistically achieve. There will be opportunity for the church and community to feed into this process in the months ahead. Whatever happens, there will be significant improvements to our building in the next few years, and this will only be possible thanks to the generosity of our church members.

In the meantime, let’s continue to pray that God will provide us with the resources we need to do the work God is calling us to do.

14th July 2025 – Interim Update on Internal Appeal

Our All Under One Roof pledging month, which we launched at our Anniversary Celebrations at the beginning of June has so far raised (to July 8th) over £200,000!

A total of 46 yellow envelopes have been returned so far, from a combination of individuals, couples and families, and the total is roughly equally shared across the congregations of St Frideswide’s and Spurgeon Baptist Church.

In summary, as of 8th July 2025, we have together raised a projected total of £448,873 for our joint building development fund, a portion of which has already been used for pre construction project costs, such as architectural designs and planning submission. It is our intention that once we have received planning permission (hopefully at the end of this month), we will be able to update you more fully with regard to this initial internal phase of fundraising, and what the results might mean for us as we look ahead. We will plan for a more formal update at the start of next term.

June 2025 – Celebrating 50 Years and Looking Ahead

On 7th-8th June, we celebrated 50 years since the opening of the Water Eaton Church Centre. As part of these celebrations, we also looked to the future for how we can make our building sustainable for another 50 years… and beyond!

Significant progress is being made to ensure we are ready to apply for planning permission. As part of this, we need to know how much our congregations are willing to give so we can achieve the required amount needed for redevelopment. Pledge packs have been distributed and are available on the main table outside the worship area for this purpose. If you are a regular, please do pick one up and prayerfully consider what you are willing to give towards the project.

February 2025 – New Air Source Heat Pump And Solar Panels Installed

We are pleased to say that our new hybrid Air Source Heat Pump and solar panels have been installed. The two systems together will help reduce our reliance on burning fossil fuel to heat our building and make for a greener, cleaner building.

January 2025 – Installation of New Air Source Heat Pump and Solar Panels

The Joint Church Council has been successful in obtaining a significant government grant to fund carbon reduction and energy efficiency measures. In summary, this means we will replace our gas boiler with a new hybrid Air Source Heat Pump and we will have new solar panels installed on the church roof. The two systems together will help reduce our reliance on burning fossil fuel to heat our building and make for a greener, cleaner building.